![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/img_20160219_105723_1_0_0.jpg)
Construction of offices and changing rooms
Wanting to replace the existing offices, Wetteren Municipal Council opted for a solution involving timber-frame construction.
The 400‑m² building, featuring offices, a canteen and changing rooms, was built in 10 working days.
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/img_20160219_105723_1_1.jpg)
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/img_20160219_132458_1.jpg)
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/wetteren_prefabconstructie_magazijn_3_1.jpg)