![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/2017-01-07_12.46.38_houtskeletbouw.jpg)
Crèche/Daycare
Forest Communal Council urgently required another crèche and given the tight time constraints opted for a prefabricated structure. Machiels Building Solutions was chosen as the best candidate from the call for tenders, and the council delivered the complete construction in accordance with Brussels’ passive building standards.
A combination of a plaster finish with high-pressure laminate (HPL) boards and ClicWall was chosen for the interior. The exterior was finished with durable timber cladding.
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/20170113_101721_houtskeltbouw_0.jpg)
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/20170113_101741_houtskeletbouw.jpg)
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/2017-01-07_12.47.14_houtskeletbouw.jpg)
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/2017-01-07_12.46.15_houtskeletbouw.jpg)
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/2017-01-07_12.03.49_houtskeletbouw_0.jpg)
![](https://machielsbuildingsolutions.be/wp-content/uploads/2024/03/2017-01-07_12.44.59_houtskeletbouw.jpg)