The SOK is set to become the new home ground for SK Deurne football club, near Diest.

The City of Diest opted for a circular and future-oriented construction solution, using CLT (cross-laminated timber) as the structural framework. The building was designed according to a modular grid of 5 × 5 metres, making the structure flexible, demountable and adaptable. Materials can be reused or exchanged in the future, thereby preserving their residual value. In addition, the project focuses on renewable energy and a climate-responsive design, with maximum recovery of rainwater and waste water.
For the construction, the original budget was increased from €3 million to €4.8 million. The project was put out to tender as a DBm (Design, Build & Maintenance) contract, combining design, construction and part of the maintenance within a single integrated contract.

  • Builder

    Stad diest

  • Contractor

    Beneens bv

  • Architect

    West Architectuur

  • Period

    2025

  • Address

    Hasseltsebaan 43 - 3290 Deurne (Diest)

We use cookies or similar technologies (e.g. pixels or social media plug-ins) to optimise your user experience on our website, among other things. In addition, we wish to use analytical and marketing cookies to personalise your visit to our website, to send targeted advertisements to you, and to give us more insight into your use of our website.

Do you consent to our use of cookies for an optimal website experience, so that we can improve our website and surprise you with advertisements? Then confirm with ‘OK’.

Conversely, would you like to set specific preferences for different types of cookies? This can be done via our Cookie Policy. Would you like more information about our use of cookies or how to delete cookies? Please read our Cookie Policy.